Calders Wharf in London is a four-storey residential block constructed directly above two Docklands Light Railway (DLR) tunnels. Walsh inherited this scheme from the incumbent engineers who had proposed large diameter rotary-bored piles to depths beyond the tunnels, taking loads into the underlying Thanet Sand. This is a recognised approach that works effectively where resale volumes can absorb the high foundation cost. However, in this case, planning limitations required low-rise/low unit numbers on this site, making the proposed development unviable with the large diameter bored piles.
Walsh approached the foundation design from a new angle, using our experience of building over other railway assets in London to value engineer the development. We proposed the use of a ācompensated raftā approach, constructing a sacrificial basement to offset the weight of the building. Net loadings and tunnel displacements were therefore reduced to agreed limits through an extensive and detailed liaison process with the DLR.
Extensive sub real-time monitoring of the tunnels was carried out throughout the construction process and it was observed that monitored displacements, both during construction and over the longer term, closely matched those predicted. This successful collaboration between geotechnics and structural design led to an economically viable development that now fronts the River Thames.
Read more
Read more
Read more
Read more
Read more
Read more
Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.