TIQ Glasshouse Gardens

Value engineering to explore foundation options on site with challenging ground conditions

A project within the Stratford City scheme, requiring diagnostics and value engineering. Walsh were able to achieve a cost effective and well-implemented concrete frame solution on a highly compromised piece of land.

Walsh were appointed to bring our structural and civil expertise to this development of a 30-storey and a 17-storey block of residential apartments with penthouses at the upper levels.

Our main challenge was the ground conditions. The site is on an area of land formed with spoil and contaminated fill from the Channel Tunnel Rail Link Stratford Box. Several foundation constraint solutions were investigated, including the limitations on piling techniques, amount of spoil and associated foundation sizes and risks. Further complications arose due to a network of services running through at varying levels connecting the Olympic Park with the surrounding infrastructure.

Walsh carried out a value engineering exercise on the stability system, investigating a range of options and using BIM Level 2 software to demonstrate potential solutions.

We designed the concrete frame and used lean construction techniques such as thin slabs and a minimal stability system to reduce all material quantities. This resulted in a 40% saving in concrete volume within the core and allowed for a much smaller jump form system. We were also able to offer planning support from design stage right through to completion.

Client 
  • Lendlease
Architect 
  • Allies & Morrison
Contractor 
  • Byrne Bros
Sectors 
Location 
  • London
  • Stratford

Please click on images below to open a full-screen gallery.

Explore Related Projects

Student Accommodation

Chapter London Bridge

Innovating city student living through MMC [...]

Read more

Residential

83 Barchester Street

Revitalising a site of industrial heritage for modern living and community-focused design [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Hotels

Quay House

Integrated engineering approach delivers elegant & sustainable hotel design [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Student Accommodation

Palmerston Court

MMC innovations & Passivhaus standards [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.