Tesco Woolwich Central

Value engineering reduces materials & programme

Walsh value engineered this scheme right from the start and achieved total material savings of over Ā£2.0m. This included a 6,000m3 reduction of concrete, 500-tonne reduction of reinforcement steel and 22,000m3 of soil saved from landfill. We also reduced the estimated build time by 6 months.

This versatile steel frame development is a significant step forward in the regeneration of Woolwich and demonstrated the difference that value engineering at an early stage can make.

Walsh drew on experience and expertise in post-tensioning to develop a grid of PT concrete band beams and slabs. This aimed to minimise structural depths, reinforcement and deflections. We also designed the podium level so that it helped to support the residential blocks overhead. The energy centre for the development spans across the roof of the storeā€™s service yard, via a steel-framed structure. This frame is designed to be removable in the future allowing greater versatility for the development.

As well as this network of steel frame solutions, we also faced several challenges within the foundations. When developing the double-storey basement car park, we had to give special consideration to the two Thames Water sewers which run under the building. We used structural transfer walls and beams to effectively bridge these sewers.

 

Photography Credit: Benedict Luxmoor

Client 
  • Tesco
Architect 
  • Sheppard Robson
Contractor 
  • Wilmott Dixon

Please click on images below to open a full-screen gallery.

Explore Related Projects

Student Accommodation

Chapter London Bridge

Innovating city student living through MMC [...]

Read more

Residential

83 Barchester Street

Revitalising a site of industrial heritage for modern living and community-focused design [...]

Read more

Residential

Paddington Green Police Station

Wind-tunnel testing and temporary works design reduces high-rise concrete volumes & embodied carbon [...]

Read more

Hotels

Quay House

Integrated engineering approach delivers elegant & sustainable hotel design [...]

Read more

Mixed Use

101 Camley Street

Tailoring a new-build for commercial, life sciences fit-out [...]

Read more

Mixed Use

Harold Hill Family Welcome Centre

Structural scheme designed for future-proof adaptation [...]

Read more

Taking Sustainability Seriously

Sustainability is in our DNA and we have our own ambitious goals to achieve Net Zero as a business and with our designs. With innovative in-house monitoring tools, Walsh clients have seen on average reductions of 10-20% total embodied carbon, with some of our flagship work achieving 60-70% reductions compared with baseline figures.